Debug: initializing…

New Connection for Metro Water & Sewage (CMWSSB)

Simplifying CMWSSB Connections

With 10 years of experience in metro water supply and sewage connection in Chennai, Ashwin Enterprises is your trusted partner in obtaining CMWSSB connections swiftly and efficiently. Whether you’re building a new home, a commercial space, or renovating an existing property, we understand the importance of access to clean water and proper sewage facilities.

Necessary Documents and Certificates

Building plan and completion certificates (with a notary’s seal) and proof of payment of property tax and infrastructure development charges. A surety bond, attached on a stamp paper of Rs 20, with the above mentioned documents should be submitted to the Executive Engineer at Metro Water’s headquarters.

What is the cost for a new water connection?

After you’ve submitted the required documents, you’ll need to make a payment of Rs 7,500 for a single unit. Be sure to obtain an acknowledgment for your payment.

When can I expect to receive the water connection?

Sanction orders for the water connection will be issued within 7 days from the application registration date. You can expect to have the water connection established within 30 days from the registration date.

What are the monthly charges for Metro Water services?

The monthly fees for Metro Water services differ between the core areas and the extended areas of Chennai Corporation. Core areas are charged Rs 50 per month, whereas extended areas may have to pay up to Rs 80 per month.

Our Works

At Ashwin Enterprises, we take pride in delivering exceptional metro water and sewage connection solutions. Our portfolio showcases completed projects across Chennai, demonstrating our expertise, attention to detail, and commitment to customer satisfaction.

House Water Connection Work

In this work, we provided a secure and efficient water supply connection to the household. The process involved laying new pipelines, installing valves and fittings, and ensuring a leak-proof connection. All procedures followed municipal guidelines to guarantee safe and uninterrupted water flow to the residence.

Water Meter Installation

This work involves installing a new water meter for a household connection. The meter was mounted securely with proper inlet and outlet fittings. The setup ensures accurate water usage tracking and a stable connection.

Manhole / Drainage

This project showcases the construction of a reinforced concrete manhole as part of the underground drainage system. Our team performed accurate excavation, installed quality pipes, and ensured proper alignment for smooth wastewater flow. The manhole chamber is built to withstand long-term usage and heavy load conditions.

Road Cutting & Restoration for Utility Lines

This project involved controlled road cutting to install underground utility lines. After completing the pipe-laying work, the road was restored using proper compaction and finishing to match the original level. The work ensures minimal disruption and clean reinstatement.

Chamber Repair & Maintenance

Here, we carried out repair and maintenance of an existing drainage chamber. Damaged portions were removed, new brickwork and concrete were applied, and the chamber was reconstructed to improve flow and prevent blockages. The renewed structure enhances the overall efficiency of the drainage system.

Enquiry Form